Scope of Work
Execution of diaphragm wall shoring system, anchor shoring support system, and dewatering works to support and stabilize the deep excavation in accordance with project specifications.
Details:
The project is part of the Diriyah Gate development associated with the Riyadh Metro infrastructure in Riyadh. The works involved deep excavation reaching approximately 55 meters below ground level under high groundwater conditions, requiring advanced ground support and groundwater control systems to maintain excavation stability and safe construction operations. with Saudi Vision 2030 objectives.
Location:
Diriyah Gate, Riyadh
Client:
DIRIYAH COMPANY (PIF) – BINYAH (PIF)





